High Voltage (HV) electrical infrastructure forms the critical transmission backbone of Qatars utility grids and industrial zones. Pulling heavy, semi-rigid HV XLPE cables demands rigorous engineering planning. A minor mistake can compromise the cable insulation, leading to catastrophic system failure down the road. Our certified crew utilizes advanced continuous winch setups and specialized rollers to maintain perfect control of the cables path and bend radius.
Engineering Highlights
Safe installation of heavy-gauge XLPE cables up to 132kV
Advanced bend radius calculation and tension monitoring
Qualified jointing and termination technicians with certification
Extensive experience in substation routing and switchgear connections
Machinery & Gear Used
Digital Cable Pulling WinchesCorner Cable RollersSheave GuidesTension Recording Logs
Complied Engineering Standards
Kahramaa Transmission StandardsIEC 60840QCS 2014
Service FAQ
We perform exhaustive calculations of maximum pulling tension and minimum bending radius before starting. During installation, electronic tension logs record forces in real-time, and safety barriers and communication systems keep the team coordinated.